How to use this case

Read the context, requirements and constraints. Stop before the architecture options and sketch your own in twenty minutes.

This case's numbers are illustrative: plausible and internally consistent, not measured in a named system. What is learned is the reasoning they support, not the magnitudes.

Business Context

The Instituto Previdencial administers the supplementary pension scheme for 41 state and municipal public entities — a fund with 2.9 million participants and $16.8 billion under management.

The benefits system has run on a mainframe since 1991. It calculates, grants and pays 890 thousand monthly benefits, and has never failed catastrophically in 34 years.

That has to be said first, because it sets the tone of the analysis: the legacy system works. The modernization is not motivated by failure, and a proposal that treats it as a technical problem to be eliminated will fail.

The pressures are different:

Knowledge. Nine people remain who can change the system. Their average age is 58, and six retire within the next four years. There is no replacement in the market, and training someone internally takes 2 to 3 years.

Cost. Licensing the mainframe and its base software costs $12.4 million a year, with above-inflation increases.

Speed. A change in pension rules — which happens by law, with a deadline — takes 8 to 14 months to reach production. Two legal changes in the last five years went into production past the deadline, with legal consequences.

lines of COBOL ~190 million
programs ~41,000
tables and files ~3,800
calculation rules identified unknown — estimates range
between 4,000 and 11,000
documentation out of date since ~2004
automated tests none

The line "calculation rules identified: unknown" is the project's real problem.

It is worth explaining why the estimate varies so widely. The rules are not organized: an eligibility condition may be spread across four programs, expressed as comparisons over six-character field names, and depend on a value written to a file by a process that ran in 1997. Counting rules would require understanding the code, and understanding the code is the project itself.

That circularity — to plan you need to know the scope, and to know the scope you have to execute — is the defining characteristic of modernizing an old legacy system. Any method that presupposes a known scope at the start is solving a different problem.

Functional Requirements

The system has to keep doing what it does, with no exceptions: register participants and dependents; record contributions and service time; simulate a benefit; grant a benefit according to the rule in force at the date of application; calculate and pay the monthly payroll of 890 thousand benefits; process adjustments, survivor pensions, judicial reviews and retroactive corrections; and report to oversight bodies.

The hardest requirement is in one phrase: "according to the rule in force at the date of application". Thirty-four years of legislative changes mean the system applies dozens of different rule sets depending on when the person joined, when they applied and which scheme they belong to. None of them can be lost.

Non-Functional Requirements

availability of payroll calculation 100% in the monthly window
(the payroll cannot be late)
availability of lookups 99.9%
equivalence with the legacy system 100% — no difference of a cent
in any benefit
payroll processing window < 6 h (today: 4h20)
time to implement a legal rule change < 8 weeks (today: 8-14 months)
RPO 0
retention permanent — a pension
benefit doesn't expire
auditability every calculation reproducible,
with the rules applied

The requirement of absolute equivalence dominates the project. A one-cent difference in a benefit is an error that produces litigation, and 890 thousand monthly benefits mean any error rate produces volume.

An error rate of 0.01% — which would be excellent in almost any system — would produce 89 incorrect benefits a month, more than a thousand a year. Each one is an elderly person receiving less than they are entitled to, or more than they should with a subsequent clawback. Neither is acceptable.

That arithmetic is what justifies the criterion of zero divergences for three months, which looks excessive read in isolation. It is not conservatism — it is the direct consequence of the volume multiplied by the individual severity.

Constraints

no window the payroll runs every month; there is no period
in which the system can stop
knowledge 9 people, 6 retiring within 4 years
rules they exist written nowhere but in the code
budget public, annual, subject to freezes
political
timeline leadership has a 4-year term; an 8-year project
spans two administrations
legal judicial reviews alter individual benefits
retroactively, and the system has to recalculate
audit the public accounts court oversees it; changes require
documentation and approval
team 32 engineers hired for the project,
none with mainframe experience

The political timeline constraint is what most influences the strategy: a project that only delivers value in year 7 does not survive a change of administration.

Capacity Estimates

participants 2.9 million
active benefits 890 thousand
monthly payroll 890 thousand calculations, in a 6 h window
→ ~41 calculations/s
lookups/day ~1.2 million → ~14/s, peak ~90/s
grants/month ~4,200
judicial reviews/month ~380

The volume is small by any modern measure. Forty-one calculations per second, ninety lookups per second at peak. No decision in this project is motivated by scale — and it is important to say so, because modernization projects are frequently sold with a scalability argument that doesn't hold up.

What sizes it is something else:

rule combinations to preserve estimated between 4,000 and 11,000
test cases needed to prove
equivalence unknown at the start
volume of historical data ~14 TB
years of contributions per participant up to 40

Architecture Options

The axis is how the rules come out of the COBOL without being lost.

Option A — Complete rewrite from a specification

Write the functional specification from analysis and interviews, and build the new system.

timeline estimated at 6 to 9 years
risk very high — the specification will be incomplete,
because the knowledge does not exist outside the code
value delivery only at the end
history the industry has a consistent record of failure
with this model, for systems of this nature

Option B — Automated conversion from COBOL to a modern language

Tools that translate the code, preserving the logic.

timeline 18 to 30 months
equivalence high — the logic is preserved literally
result generated code, unreadable, with the same structure
as the original; maintainability doesn't improve
cost reduces licensing; doesn't reduce the dependency
on knowledge

Option C — Strangling by domain, with proven equivalence

Extract capabilities one by one, with the new system running in parallel and compared with the legacy one until equivalence is proven, and only then taking over the traffic.

timeline continuous delivery; first capability in ~8 months
complete shutdown in 6 to 8 years
risk per step low — each extraction is compared and reversible
value delivery continuous, which meets the political constraint
cost two systems coexisting for years
rule
recovery the parallel comparison is the mechanism that
discovers the rules

Option D — Encapsulate and freeze

Keep the legacy system as is, wrap it in modern interfaces, and build only what is new outside it.

timeline 12 to 18 months for the interfaces
risk low
cost licensing kept in full
knowledge the main problem is not solved; when the
9 people leave, the system becomes untouchable

Trade-off Analysis

CriterionWeightA — RewriteB — ConversionC — StranglingD — Encapsulate
Risk of a benefit error30%28910
Resolving the knowledge risk25%8491
Value delivery over time20%1597
Cost reduction15%8871
Speed of future change10%9392
Weighted total4.95.98.75.0

Sensitivity analysis, redistributing the remaining weight proportionally across the other criteria. With risk of error at 50%, the totals become 4.1 / 6.5 / 8.8 / 6.4 — Option C keeps its advantage, by a wider margin than in the base matrix. With cost at 40%, they become 5.8 / 6.5 / 8.2 / 3.8. No scenario tested inverts it.

The 30% weight on risk of error reflects the domain's nature: a calculation error in a pension benefit affects an elderly person's income and creates legal liability. It is the criterion leadership and the accounts court placed above all others.

Decision

Strangling by domain with proven equivalence (Option C), with parallel comparison as the central mechanism — not as a validation step, but as the way to discover the rules nobody knows.

That inversion is the project's central idea: instead of trying to document the rules and then implement them, the new system is implemented with the best available understanding, run in parallel over real cases, and every divergence is a discovered rule.

The practical consequence is that the project starts wrong on purpose. The first version of a capability's calculation engine diverges in thousands of cases, and that is the expected result — each divergence is information that did not exist. A team that treats the initial divergences as failure will abandon the method in the third week.

Communicating that to leadership and to the accounts court before starting was as important as the technical design. The indicator tracked is not "how many errors do we have", it is "the divergence rate is falling" — and the descending curve is what demonstrates progress.

Under what condition each discarded option would win:

Option A would win if the rules were documented and verifiable — which is the case in newer systems or in domains with a complete and current normative specification.

Option B would win if the objective were exclusively to leave the mainframe on cost, with a short deadline and no expectation of improving maintainability. It is a legitimate option as an intermediate step in situations of contractual urgency.

Option D would win if the knowledge risk did not exist — if there were a market or internal training to replace the 9 people. It remains partially in use: the legacy system is encapsulated while it is strangled, and that is what makes it possible to build the new one outside.

Components

Service Facade. Exposes the legacy system through modern interfaces, letting the new consume the old during the transition.

Capability Router. Decides, per operation, whether it goes to the legacy system or to the new one. It is the point of switchover and rollback.

Equivalence Comparator. Executes the same operation on both systems and compares the results. It is the project's most important component.

Calculation Engine. The new benefit calculation system, with the rules expressed declaratively and versioned by period of validity.

Rule Catalog. A repository of the discovered rules, with validity, legal source and associated test cases.

Participant Service. Registration, dependents, relationships.

Contribution Service. Contribution history and service time.

Benefit Service. Granting, maintenance, review.

Payroll Processor. Monthly calculation.

Data Extractor. Synchronization from the legacy system to the new one during coexistence.

The Rule Catalog is the highest-value artifact the project produced, and it did not exist as an initial objective. It emerged from the need to record every rule discovered by the comparison, and it is what resolves the knowledge risk — far more than the new code does.

Data

Data strategy during coexistence. The legacy system remains the source of truth until a capability is switched over. The Extractor synchronizes continuously to the new system, which operates read-only until it takes over.

That single direction — legacy to new, never the reverse — is the lesson from the e-commerce case applied here, and it was decided on that basis: bidirectional synchronization between two sources of truth does not work.

Rule model.

rule (id, domain, description, valid_from, valid_to,
legal_source, expression, discovered_at, confirmed_by)
test_case (id, rule_id, input, expected_output, origin)

The test case's origin field distinguishes three provenances: a case built from the legislation, a case extracted from the legacy code, and a case discovered by divergence. The third is the most valuable.

Historical data. The 14 TB stay in the legacy system through almost the whole project and migrate last. Migrating early would create the need to keep both synchronized for years, with no benefit.

Calculations. Every calculation is stored with the rules applied and the engine version, which satisfies auditability and allows reprocessing. A recalculation from a court decision needs to know which rules were originally applied.

Integration

Parallel comparison, which is the core of the method.

1. the Router sends the operation to the legacy system (which answers the user)
2. it also sends it to the new system, asynchronously
3. the Comparator confronts the two results
4. divergences are recorded with input, outputs and context
5. each divergence is analyzed: an error in the new one, or an unknown rule?
6. discovered rules enter the Catalog, with a test case
7. when the divergence rate reaches zero for N periods, the capability
is considered equivalent

The exit criterion per capability is strict: zero divergences across 100% of operations, for three consecutive months. For the payroll, that means three complete monthly payrolls — 2.67 million calculations — with not one cent of difference.

What the comparison found. This is the case's most transferable result.

divergences analyzed, total ~31,000
errors in the new system ~24,000 (77%)
unknown rules discovered ~6,400 (21%)
errors in the legacy system ~600 (2%)

The 600 legacy errors deserve attention: over 34 years, the system calculated some cases incorrectly, and nobody knew. Most were in rare combinations — specific transition schemes, benefits with multiple judicial reviews. Each was taken to the legal team, and 17 resulted in retroactive correction of benefits.

Data extraction. Continuous, from legacy to new, with daily integrity verification. It is the only integration that persists throughout the project.

Interfaces with oversight bodies. Kept in the legacy system until the last phase, because they are stable and there is no value in migrating them early.

Security

participant data sensitive personal data; classification,
flow mapping and declared retention
access by role and by unit, with a trail
benefit alteration requires two approvers and a recorded reason
calculation immutable after payment; a recalculation is
a new record
trail permanent, immutable
parallel comparison the Comparator has read access to both
systems; its credentials are the most
sensitive in the project
test environment synthetic or anonymized data; never
a production copy

The restriction against ever using a production copy in tests created a real problem: proving equivalence requires real cases. The solution was to run the comparison in production, with the new system in shadow mode, rather than trying to reproduce production in another environment.

That decision — comparing in production rather than simulating — is what made the method viable, and it is safe because the new system answers to nobody during the shadow phase.

Getting that approach approved by the accounts court required demonstrating three properties: the shadow system writes to no production system, exposes data to no user, and has its access logged and auditable like any other. Documenting that formally took two months and was a project prerequisite.

Organizations with strong external audit frequently rule out comparison in production by assuming it would not be approved. In this case, it was — and the decisive argument was that the alternative, switching over with no comparison, presented far greater risk to the beneficiaries.

Scalability

There is no scale challenge. The new system is sized with a wide margin for 41 calculations per second, and the complete payroll runs in about 40 minutes against the legacy system's 4h20.

That reduction was not an objective and is a side effect of modern hardware. It has a practical use: the roomy window allows running the payroll twice during coexistence — once on the legacy system, once on the new one — within the same night, which is what makes the monthly comparison possible.

Reliability

Throughout coexistence, the legacy system is the safety net. If the new system fails in any already-switched capability, the Router reverts to the legacy system in seconds, by configuration.

That rollback was used 14 times over the project, all in the first weeks after a switchover, and none resulted in a payment error.

After the legacy shutdown, reliability depends entirely on the new system, and the design reflects that: RPO zero with synchronous replication, RTO of 10 minutes with automatic promotion, and disaster recovery in another region with a semiannual rehearsal.

The monthly payroll has special treatment: it is the only process whose failure has an immediate and irreversible consequence — 890 thousand people not being paid. The contingency plan includes an emergency procedure that reprocesses the previous month's payroll with an adjustment, legally approved, and it has never had to be used.

Observability

divergence rate per capability and per operation type
divergences by class: new-system error, new rule, legacy error
rules in the catalog, and coverage by test cases
progress: % of operations served by the new system, per capability
payroll time, on both systems
rollbacks triggered, with cause
capability remaining in the legacy system, measured in programs and in rules

The capability remaining in the legacy system metric is what leadership tracks, and it was chosen carefully: measuring in remaining lines of COBOL would be misleading, because much of the code is unreachable or duplicated. Measuring in programs actually executed in the last year and in catalogued rules gives an honest read of progress.

Deployment

The new system uses continuous deployment. The legacy system keeps its original cycle — changes there are rare and go through the usual process.

Switching a capability over is a configuration change in the Router, done at a low-activity hour, with intensive monitoring for two weeks.

No switchover in the five days preceding payroll processing.

Evolution Strategy

The order of capabilities was defined by three combined criteria: low risk, visible value, and independence from the others.

Phase 1 (months 1–8): facade and lookups. The legacy system is encapsulated, and participant and benefit lookups start being served by the new system, from extracted data.

Value delivered early: the participant portal, which did not exist, was built on the facade and went live in month 6. It is what sustained the project politically in the first year.

Phase 2 (months 7–20): benefit simulation. The first calculation capability. Chosen because a simulation generates no payment — an error is visible and harmless.

This is where the method proved itself: 11 thousand divergences analyzed, 2,800 rules discovered, and no effect on any participant.

Phase 3 (months 18–36): granting. Benefit calculation at the point of granting, with three months of comparison before the switchover.

Phase 4 (months 30–52): payroll. The central capability. Compared for six months — twice the standard criterion — before the switchover.

Phase 5 (months 48–72): reviews, retroactive corrections and special cases. The long tail, which concentrates most of the rare rules.

Phase 6 (months 66–84): historical migration and shutdown. The 14 TB and the termination of the contracts.

Conditions that would change the plan:

if a capability's divergence rate doesn't reach zero after
12 months of comparison
→ that capability is reassessed; the rule model may not
be able to express it

if more than 3 of the 9 people with legacy knowledge leave
before Phase 4
→ the priority shifts to cataloguing rules, even without
implementing them

if there is a structural legislative change during the project
→ it is implemented only in the new system, and the
corresponding capability is brought forward

if the budget is frozen below a threshold
→ the project pauses in a consistent state; no phase
can end with a capability partially switched over

The last condition guided the design of every phase: each phase ends in a state where the project can stop for a year with no damage. That was required by the reality of public budgeting, and it produced a better plan.

Results

Numbers at the end of Phase 4, 52 months after the start:

operations served by the new system from 0% to 78%
rules catalogued 6,400, all with a test case
payroll divergences, last 6 months 0
time to implement a legal rule change from 8-14 months to 5 weeks
licensing cost from $12.4M/year to $6.2M/year
people able to maintain the system from 9 to 34
historical legacy errors corrected 17 benefits, retroactively
payroll time from 4h20 to 38 min

The number leadership highlights is the people one: from 9 to 34, with training new ones possible in weeks instead of years. The risk that motivated the project was resolved.

And there is a result that was in no target: the Rule Catalog became the Institute's reference document on the pension legislation it applies. It is consulted by the legal team in litigation, because it describes precisely which rule was applied to which benefit, in which validity period, with the corresponding legal source — information that previously existed only inside the COBOL, and that no legal opinion could cite with confidence.

What this case teaches

Parallel comparison doesn't validate — it discovers. The 6,400 catalogued rules existed written nowhere. Trying to document them before implementing was Option A's path, and it is where projects of this nature fail.

The legacy system was right, almost always. 77% of divergences were errors in the new system. Treating the legacy system as the reference, and not as a suspect, is what makes the method trustworthy — and the 2% where it was wrong were found precisely by taking it seriously.

Delivering value early is a requirement, not a virtue. A seven-year project in a public organization spans two administrations. The participant portal in month 6 bought the legitimacy that sustained the following five years.

Every phase has to end in a stable state. The budget constraint forced a design in which the project can stop at any moment with nothing left half-done. That improved the plan — and it is a discipline projects with stable budgets rarely adopt.

Practical Exercise

Pick a legacy system in your context and answer: if you had to prove a new system behaves the same as it, which cases would you compare over?

If the answer is "I don't know which cases exist", you are in the same situation as this case — and comparison in production is the only method that produces the list.

Interview Questions

  • Why is parallel comparison a discovery mechanism and not merely a validation one?
  • Why is 77% of divergences being errors in the new system a good sign?
  • Why does every phase have to end in a state where the project can stop?

Further Reading

  • Feathers, Michael. Working Effectively with Legacy Code. Prentice Hall, 2004.
  • Newman, Sam. Monolith to Microservices. O'Reilly, 2019.
  • Fowler, Martin. StranglerFigApplication. martinfowler.com, 2004.
Finished reading this document?Your progress is saved in this browser only.