Exercise 08 — Modernize a Legacy System

Context

The Valley Agricultural Cooperative processes harvest purchasing for 11,000 farmers. The system that does it went into production in 2007.

lines of code ~2.4 million, in Delphi
database Firebird, a schema with 840 tables
integrations 3 banks, 2 regulators,
one tax system
people able to change it 2, with 19 and 14 years at the company
documentation out of date since 2011
automated tests none
availability in 2025 99.7%

The system works. It has never lost a payment and never miscalculated a harvest. That has to be said first, because a proposal that treats it as a problem will be rejected by the people who have maintained it for nineteen years.

Three pressures motivate the discussion:

Knowledge. The two people retire in four and seven years. There is no market for the technology, and training someone internally took, on the last attempt, two and a half years — and the person left.

A digital channel. The cooperative wants farmers to check their position and schedule delivery from their phones. The system has no programmable interface of any kind.

Regulatory. A new regulation requires origin traceability by batch, with a 30-month deadline. Implementing it in the current system was estimated by the two people at 14 months.

Requirements

The system has to go on doing everything it does. Beyond that, over a 30-month horizon:

a programmable interface for the digital channel
origin traceability by batch
more than two people able to maintain the system

Constraints

no window the harvest peaks in four months of the year;
in those periods nothing can be touched
team the cooperative can hire up to 8 engineers;
none of them will learn Delphi
budget approved yearly, with the risk of a freeze
regulatory deadline 30 months, with a fine
the two people have to take part, and cannot be treated
as an obstacle
business rules are not written down anywhere but the code

Your Task

Produce, in up to 90 minutes:

  1. The strategy: rewrite, convert, strangle or encapsulate — with the reason.
  2. The order of the phases, and what is left if the work stops at the end of each one.
  3. How the business rules come out of the code without being lost.
  4. The role of the two people in the plan.
  5. How you meet the 30-month regulatory deadline within the chosen strategy.

Questions You Should Be Asking

which features change frequently, and which haven't changed
in years?
where are the integrations, and which are stable?
is the 840-table schema all in use?
is there an access log showing what actually runs?
which part of the system does the regulatory traceability touch?
what does the digital channel need to read, and what does it need to write?

The fourth is the most valuable and is almost never asked: in nineteen-year-old systems, a large fraction of the code is unreachable.

Assessment Criteria

Your answer is good if:

  • You did not propose a complete rewrite. With undocumented rules, two people and a regulatory deadline, it is the strategy with the highest historical failure rate in this scenario.
  • The first phase delivers value and is not infrastructure. If the plan is cancelled in month 8, what is left has to be good for something.
  • You meet the regulatory deadline without depending on the entire modernization. Thirty months do not cover 2.4 million lines.
  • Rule recovery is by comparison, not by reading. Nobody is going to read 2.4 million lines of Delphi and extract a correct specification.
  • The two people have a role of authority, not of a source to consult. They know what nobody else knows, and the plan depends on that.

Your answer is weak if it starts with "let's build the new platform" and treats the two people as a risk to mitigate.

Discussion

:::details Open after trying

The strategy is strangling, with the legacy system encapsulated early on.

The reason is not preference: rewriting requires the specification that doesn't exist, and converting automatically preserves the logic without solving the knowledge problem — the generated code stays unreadable to the eight new engineers.

The order, and what is left at each stop:

phase 1 (4 months) a read facade over the legacy system
→ the digital channel goes live
if it stops here: the farmer checks their position for
the first time, and the cooperative has a visible result

phase 2 (8 months) batch traceability, built OUTSIDE the
legacy system, fed by events the facade emits
→ the regulatory deadline met in month 12, with
18 to spare
if it stops here: compliance guaranteed

phase 3 (12 months) extraction of the capabilities with the highest rate
of change, with parallel comparison
if it stops here: part migrated, part in the legacy
system, both working

phase 4 (ongoing) the rest, in order of risk

Phase 2 is the decision that solves the exercise. The traceability does not have to be inside the legacy system — it needs the data the legacy system produces. Built outside, it takes 8 months instead of the 14 estimated inside, and it depends on neither of the two people.

Whoever puts the traceability inside the legacy system consumes 14 of the 30 months, occupies the two people who are the scarcest resource, and arrives at month 14 having modernized nothing.

The rules come out by comparison. The new system is implemented with the best available understanding, runs in parallel over real transactions, and each divergence is a rule discovered. Reading the code doesn't work: in nineteen years, the harvest calculation logic has cases nobody remembers writing.

See the modernization case study.

The two people are the authority over the comparison, not the source of the specification. Their role is to decide, faced with a divergence, which behavior is correct — and that judgment is what no document replaces.

Treating them as an obstacle is the most common and the most expensive error: they can sink the project without doing anything, simply by not collaborating, and they would be right.

The question about unreachable code usually pays off: in systems of that age, between 30% and 50% of the code hasn't run in years. Discovering that reduces the real scope before a single line is written, and it is the project's highest-return survey.

The harvest peaks define the calendar: eight months of the year are usable, four are not. A 30-month plan has, in practice, a 20-month window — and that has to be in the schedule from the start, not discovered at the first peak.

:::